Fire alarm systems across all three buildings at Claremont Quarter, plus an evacuation alert system in Block 3, for Millharbour MEP on Chase New Homes' landmark development in north west London.

  • 251 apartments

  • 2 life safety systems: fire alarm + evacuation alert

  • 3 buildings covered

  • BAFE registered and NSI Gold engineers

The project

Claremont Quarter brings 251 one, two and three bedroom apartments to Claremont Road, Cricklewood NW2. With 40% sold while the frames were still going up, life safety systems could never be allowed to hold up handover.

Millharbour MEP, the M&E contractor on the scheme, appointed Big Brother Fire & Security to install fire alarm systems across all three buildings, and an evacuation alert system in Block 3, the tallest block on the site.

How we're delivering it

01 – Inducted and briefed. Every engineer completed the full site induction and reviewed the drawings before starting work.

02 – Planned on the ground. We walked each block together, agreeing cable routes, risers and interfaces with other trades on site, not just on paper.

03 – 1st & 2nd fix well under way. In Block 1, fire-resistant cabling is in and devices, interfaces and the fire alarm panel are being fitted floor by floor, from the plant room to the roof, keeping pace with the build.

Site progress – Block 1

Fire-resistant cabling runs from the plant room to the roof, interface units are installed and labelled in the risers, roof sounders are fitted, and the fire alarm panel is now in place in the entrance lobby alongside the smoke control panel.

Fire alarm panel installed in the Block 1 entrance lobby, next to the smoke control panel.
Fire alarm panel installed in the Block 1 entrance lobby, next to the smoke control panel.
Detector base and fire-resistant cable run on cable tray in the Block 1 plant room
Detector base and fire-resistant cable run in the Block 1 plant room.
Fire alarm interface units installed in the Block 1 plant room.
Fire alarm interface units installed in the Block 1 plant room.
Labelled interface unit in a Block 1 riser.
Labelled interface unit in a Block 1 riser.
Roof sounders fitted on Block 1, with fire-resistant cabling on raised cable tray.
Roof sounders fitted on Block 1, with fire-resistant cabling on raised cable tray.
Roof sounder alongside the smoke shaft vent on Block 1.
Roof sounder alongside the smoke shaft vent on Block 1.
Second-fix fire alarm device in a Block 1 ancillary room.
Second-fix fire alarm device in a Block 1 ancillary room.
Roof sounders fitted on Block 1, with fire-resistant cabling on raised cable tray.
Roof sounders fitted on Block 1, with fire-resistant cabling on raised cable tray.
Roof sounder alongside the smoke shaft vent on Block 1.
Roof sounder alongside the smoke shaft vent on Block 1.
Fire alarm device fitted in a Block 1 ancillary room.
Fire alarm device fitted in a Block 1 ancillary room.

What's next

Second fix, commissioning and handover across the development.

Building something residential? Talk to Big Brother Fire & Security about fire and security from first fix to final certificate.

Comments


3ec206a7-23d2-412d-9650-de060cde59fe.png

Professional fire and life-safety systems for commercial buildings. Design, installation, maintenance and support.

  • Facebook
  • Instagram
  • X
  • LinkedIn
  • Youtube

Get in Touch

124 City Road, London, EC1V 2NX

Protecting Buildings - Protecting People - Supporting Compliance -

© Big Brother Fire & Security - All Rights Reserved | Privacy Policy | Website by Liv X Media

bottom of page